/ Home
/ About CTG
/ Green Life
/ Business
/ News & Media
/ Sustainability
Chinese
English

CTG-backed Karot hydropower project ready to commission NO.1 generator

Date: 2022-01-05

图片3

Karot hydropower station in Pakistan, funded and constructed by China Three Gorges Corporation (CTG), on December 28 announced that its No.1 generator is ready for commissioning, paving the way for its full operation by 2022.

Once in full operation, the station will provide 3.206 billion kWh of clean energy for Pakistan every year, reducing carbon dioxide emissions by 3.5 million tons that will positively contribute to increasing the share of clean energy and optimizing the energy structure of the country.

All Copyrigh

By China Three Gorges Corporation

Reprinting or mirroring is strictly prohibited without written authorization,

and offenders will be held liable.

CTG-backed Karot hydropower project ready to commission NO.1 generator

Date: 2022-01-05

图片3

Karot hydropower station in Pakistan, funded and constructed by China Three Gorges Corporation (CTG), on December 28 announced that its No.1 generator is ready for commissioning, paving the way for its full operation by 2022.

Once in full operation, the station will provide 3.206 billion kWh of clean energy for Pakistan every year, reducing carbon dioxide emissions by 3.5 million tons that will positively contribute to increasing the share of clean energy and optimizing the energy structure of the country.

All Copyrigh

By China Three Gorges Corporation

Reprinting or mirroring is strictly prohibited without written authorization,

and offenders will be held liable.

Contact Us
Address :No. 1 Liuhe Road, Jiang'an District, Wuhan City, Hubei Province, China

Site Map

Link

Copyright 2022-2026 - China Three Gorges Corporation. All rights reserved.
Copyright 2022-2026 - China Three Gorges Corporation.