/ Home
/ About CTG
/ Green Life
/ Business
/ News & Media
/ Sustainability
Chinese
English
Digital
Digital "twin" supports waste-to-energy operations
What happens when a waste-to-energy plant gets a digital "twin"?
2026-07-17
Da'an Haituo Wind Farm has maintained safe operation for over 5,000 consecutive days
Da'an Haituo Wind Farm has maintained safe operation for over 5,000 consecutive days
How has a wind farm maintained safe operation for over 5,000 consecutive days?
2026-07-16
A small PV station making a big difference in restoring sandy land
A small PV station making a big difference in restoring sandy land
A 23.2-megawatt photovoltaic (PV) station may be small, but not when it comes to ecological restoration.
2026-07-15
A decade of partnership: a new chapter in China-Brazil clean energy cooperation
A decade of partnership: a new chapter in China-Brazil clean energy cooperation
10 years ago, CTG Brasil began operating of the Jupiá and Ilha Solteira hydropower plants on the Paraná River. Today, the two plants have become a mod...
2026-07-14
Hami 1-million-kilowatt solar-thermal and PV project enters commercial trial operation
Hami 1-million-kilowatt solar-thermal and PV project enters commercial trial operation
Recently, the Hami 1-million-kilowatt integrated concentrated solar-thermal power and photovoltaic (PV) energy demonstration project in Xinjiang Uygur...
2026-07-13
Green practices at Tiantai Pumped-storage Power Station
Green practices at Tiantai Pumped-storage Power Station
What happens to more than seven million cubic meters of rock and soil excavated from a major clean energy project? At Tiantai Pumped-storage Power Sta...
2026-07-10
Key technologies for the Baihetan Hydropower Station mega hub project
Key technologies for the Baihetan Hydropower Station mega hub project" won national first prize
The CTG-led project "key technologies for the Baihetan Hydropower Station mega hub project" won the first prize of the 2025 State Scientific and Techn...
2026-07-09
Changlongshan pumped storage power station supports grid stability over five years
Changlongshan pumped storage power station supports grid stability over five years
Five years, more than 29,300 unit start-stop cycles, over 78,166 operating hours, and 11.4 billion kWh delivered to the grid.
2026-07-09
Three Gorges Dam tourist area reports strong performance in first half of 2026
Three Gorges Dam tourist area reports strong performance in first half of 2026
In the first half of 2026, the Three Gorges Dam tourist area welcomed more than 1.61 million visitors, up 9.6 percent year on year, as this engineerin...
2026-07-08
Engineering behind the giant
Engineering behind the giant "power bank"
Recently, Tiantai Pumped-storage Power Station in Zhejiang province — China's largest pumped storage station by single-unit capacity — has entered ful...
2026-07-03
Contact Us
Address :No. 1 Liuhe Road, Jiang'an District, Wuhan City, Hubei Province, China

Site Map

Link

Copyright 2022-2026 - China Three Gorges Corporation. All rights reserved.
Copyright 2022-2026 - China Three Gorges Corporation.