CTG’s wind farm in SW China's Yunnan Province successfully enters operations
Date: 2025-01-22
Recently, the flexible direct current (DC) project at CTG's wind farm in Mile city, Honghe Hani and Yi autonomous prefecture, southwest China's Yunnan Province, successfully transitioned to grid-connected operation after completing a continuous 168-hour trial run.
Located at an altitude of 2,500 meters, the project marks a significant milestone as the wind farm becomes the first in the world to adopt China-produced 6.5-kilovolt high-voltage IGCT power devices and 4-kilovolt high-voltage DC dry capacitors in a flexible DC system for wind power.
All Copyrigh
By China Three Gorges Corporation
Reprinting or mirroring is strictly prohibited without written authorization,
and offenders will be held liable.


