/ Home
/ About CTG
/ Green Life
/ Business
/ News & Media
/ Sustainability
Chinese
English

Karot Hydropower Station completes its 2025 full-load test

Date: 2025-05-14

Situated on the Jhelum River in Pakistan's eastern Punjab Province, the Karot Hydropower Station completed its 2025 full-load test, demonstrating stable performance at full capacity.

All four generating units operated continuously at a total output of 720 MW for six hours, with all generation and transmission systems operating well within their designated technical parameters.

All Copyrigh

By China Three Gorges Corporation

Reprinting or mirroring is strictly prohibited without written authorization,

and offenders will be held liable.

Karot Hydropower Station completes its 2025 full-load test

Date: 2025-05-14

Situated on the Jhelum River in Pakistan's eastern Punjab Province, the Karot Hydropower Station completed its 2025 full-load test, demonstrating stable performance at full capacity.

All four generating units operated continuously at a total output of 720 MW for six hours, with all generation and transmission systems operating well within their designated technical parameters.

All Copyrigh

By China Three Gorges Corporation

Reprinting or mirroring is strictly prohibited without written authorization,

and offenders will be held liable.

Contact Us
Address :No. 1 Liuhe Road, Jiang'an District, Wuhan City, Hubei Province, China

Site Map

Link

Copyright 2022-2026 - China Three Gorges Corporation. All rights reserved.
Copyright 2022-2026 - China Three Gorges Corporation.