Karot Hydropower Station completes its 2025 full-load test
Date: 2025-05-14
Situated on the Jhelum River in Pakistan's eastern Punjab Province, the Karot Hydropower Station completed its 2025 full-load test, demonstrating stable performance at full capacity.
All four generating units operated continuously at a total output of 720 MW for six hours, with all generation and transmission systems operating well within their designated technical parameters.
All Copyrigh
By China Three Gorges Corporation
Reprinting or mirroring is strictly prohibited without written authorization,
and offenders will be held liable.